Project Overview

National Grid is proposing to repower its E. F. Barrett Power Station located in the Town of Hempstead, Nassau County, New York, immediately adjacent to the the Village of Island Park. The proposed repowering will result in a new modern energy center at the Barrett Station through the installation of new, state-of-the art electric generators and the removal of existing electric generating equipment currently on the site. The new energy center will provide a more efficient and cost-effective facility to produce electricity while minimizing impacts on the surrounding communities and providing tax benefits into the future. The repowering, once approved by LIPA and licensed, will also provide numerous construction jobs during the construction period.


Need for the redevelopment of the E.F. Barrett Station

This proposed repowering will be evaluated by the Long Island Power Authority’s (LIPA) against its future and anticipated generation capacity needs. A repowered Barrett electric generating station would provide LIPA the opportunity to meet its electricity requirements by producing more electricity in a more efficient and cost-effective manner than the existing facility. Under its current contract, National Grid will propose repowering options at the facility for LIPA’s consideration.


Environmental and Economic Benefits

  • Uses existing generation station property
  • Generates electricity more efficiently and cost-effectively
  • Improves reliability of electricity supply
  • Reduces emission rates through use of state-of-the-art technology
  • Uses clean-burning natural gas as a primary fuel and ultra-low sulfur diesel as a back-up fuel
  • Reduces water requirements by eliminating “once-through” cooling
  • Creates hundreds of construction jobs
  • Provides site tax benefits into the future

Repowering Proposal

National Grid is developing a repowering proposal for LIPA’s consideration that includes various options that can meet LIPA's future needs as well as improve efficiency of the site & potentially support Renewable Resources.



How is the project licensed?

The project will be Licensed under Article 10 of the NYS Public Service Law and permitted by the NYS Department of Environmental Conservation. This process is expected to take up to 16 months to complete. During that time National Grid will be working on designs and performing various studies that will be presented to the State Regulators and the Public as part of the Licensing and Permitting Process.


When will the construction begin?

Construction will not begin until LIPA makes its decision on the proposal and Project Licensing is complete.